Unloading blue bloard from the truck (12 ft sheets)
Stacking the blue board in the kitchen
Frank notices that we have a screech owl (in red phase) nesting in our chestnut tree.
Owl close-ups (digiscoped through our spotting scope).
Installing wall board in the ceiling.
This sheet covers the window and the window is being cut out.
Using the zip tool to trim around the skylight
Finished laundry room walls (ceiling must wait until range hood ventilation piping and external motor is installed.
Fitting a piece into the bay.
Measuring in the skylight
The "director"
Taping the joints and adding metal corners finishes the job.
All ready for plastering on Monday