Day 48 - Apr 22, 2003 - Pre-General Inspection


Back to kitchen page ......Previous construction day ......Next construction day

Water line for sub-zero ice maker (we almost forgot this)


Hole in chimney patched up


All holes between beams/studs plugged with firestop material


Skylight readied for drywall


Firestop material added to top of all bays with openings to above level


Plumber with his heating consultant scoped out the heating. This shows the 1/2 in thick plywood radiant heat "quik track" material with aluminized back and grooved front for heating water tubes. It turns out we will also need a kick space heater under the last section of the wet bar cabinet for the coldest days.


Joists in laundry room firred out so pipes on outside wall will get full insulation thickness


Back to kitchen page ......Previous construction day ......Next construction day