Day 46 - Apr 18, 2003 - Rough plumbing finished


Back to kitchen page ......Previous construction day ......Next construction day

Mike installing R30 insulation in the laundry room floor


Copper plumbing showing feed to laundry room and to main sink (to the right)


Frank shimming the addition back wall


Joe sorting out his copper fittings after finishing the rough plumbing


Frank nailing down the laundry room flooring


Mike rips a piece of flooring for the laundry room


Laundry room floor glued and nailed in place


Finished shimmed wall - the wall was 2 3/4 in out of plumb (the old part of the house was quite crooked).


Dryer vent plugged up (my handiwork). Mike will fix the siding. A new hole will be drilled to fit the new dryer such that the new dryer can be pushed flush to the back wall (i.e. no dryer vent hose needed)


Back to kitchen page ......Previous construction day ......Next construction day